Re: Site Trunking


Posted by Rich Williamson on August 19, 1999 at 08:06:45:

In Reply to: Re: Site Trunking posted by A.SWED on August 18, 1999 at 20:09:32:

: I heard them talking about there T1's and T2's
: T1's and T2's are a bundel phone lines tied together for incoming or out going info ether voice or data.
: T1's have 26 pair and T2's have twice that.

- That's logical capacity. T1 is actually a bandwidth spec (as described by 6P21), regardless of the medium (wire, fiber, microwave, etc.). A typical telco-leased T1 will be carried over 2 pairs of copper ("4-wire circuit") and will be terminated by a Channel-Bank, CSU/DSU, or other mux/demux equipment depending on how the circuit is being used.

: : During the crash, I listened to the radio shop (63184)
: : and I heard the saying that some of there data switches
: : were cycling on and off.

: : I heard them talking about there T1's and T2's (not quite sure what these are)

: : They also said that the problems probably started at the Apple Cove site. If I understood what one tech. was saying, he therorized that
: : the temp. yesterday might of had a factor in this. He wondered of the site's air conditioner went down and the temp. rose to some level
: : that caused a high temp. shutdown. I didn't hear what the final cause was, but last night the supervisor was going to get together with all
: : of the tech's and analize all of the data to come up with the cause

: : Jeff